- The W-5030 operates in linkage with the SEM from starting to closing. When the SEM is closed, the W-5030 closes its operation automatically after cooling the DP.
- It requires no plumbing for water supply and drain.
- It saves on water consumption as it operates with water in the builtin container. No extra water supply is required.
- When freezing of water is anticipated, anti-freeze can be used for the cooling water.
- When there is an unexpected water leak from tubing of the W-5030 and SEM (or AA), maximum volume of water is in the container. There is no continuous flow of water from the pipeline.
- A new coolant of HFC-134a has been used for environmental protection purposes.